The Chip Board
Custom Search
   


The Chip Board Archive 17

Re: From a hamburger engineers point of view

Well, my guess is they attempt to keep the water level constant, so once they decided what that level would be, they built the bridge accordingly and there is no need to take the weight of the ships into consideration.

Messages In This Thread

NCR For The Engineers On The Board NCR
Weight of ships has to be in the calculation
Ahh - I see, thank you David.
True, but since water is fluid............
That is probably too complex an answer for Bill
From a hamburger engineers point of view
Re: From a hamburger engineers point of view
Re: From a hamburger engineers point of view
Possible, but remember, the weight of whatever
Does it make any difference...
Perhaps the system only needed to...
Re: NCR For The Engineers On The Board NCR
NCR Didn't mean to open a can of worms but NCR
Re: NCR Didn't mean to open a can of worms but NCR
Bill,
Re: NCR Didn't mean to open a can of worms but NCR
Re: NCR Didn't mean to open a can of worms but NCR
Greg,
Greg is correct, but no it would not overflow
That makes sense.....

Copyright 2022 David Spragg